Flooding The Flooding Sub-Committee was set-up in January 2016 in order to address increasing incidents of flooding from rain and sewage in the area. Initial Report from the Flooding Sub Committee is available below Flooding Sub Committee Report File Uploaded: 8 August 2016 4.2 MB Thames Water document - Alton Drainage Strategy File Uploaded: 26 January 2017 3.9 MB